Message posted by secretservices (Member since 05/04/2020) on June 19, 2024 at 8:51:42 PST:
RATT was not working with China Lake. Their clearance for Shoshone was not in the system with Joshua. And their player was not in the area yet. Delayed, awaiting DOUGH-81 who does have clearance. Worked RAINBOW after AR with TAHOE.
In Reply to: Re: RATT55 ADSB posted by Joerg (Webmaster) on June 18, 2024 at 13:11:57 PST:
Replies: