Message posted by Joerg (Webmaster) (Member since 10/17/2000) on March 15, 2025 at 13:54:42 PST:
Yes, you normally run utility lines before the building construction begins. In the 8/2019 GE image the cut across the taxiway looks pretty fresh, so it was probably done earlier in 2019. Construction of the extensions began in late 2019 or early 2020.
In Reply to: Re: Area 51 live stream tonight 7pm PDT posted by Altner on March 15, 2025 at 13:39:10 PST:
Replies: