Re: New tower at Area 51


Message posted by stark on October 20, 2006 at 23:34:00 PST:

To throw a couple thoughts at the wall.....

If it is a drill rig, could the drilling be for some type of environmental remediation, or soil sampling?

Again if it is a drill rig, why would it be in the same position for 9 months (more or less)? Could it also be used for raising / lowering some device in the hole? (I don't know squat about drill rigs.)


In Reply to: Re: New tower at Area 51 posted by Scot Tway on October 20, 2006 at 21:31:54 PST:

Replies:



[ Discussion Forum Index ] [ FAQ ]