Message posted by Scot Tway on July 04, 2006 at 19:07:01 PST:
As the road in was well traveled by what appeared to be heavy vehicles and the cleared area is fairly large I think some form of drilling was done and sensors mounted at the well head. The slab looks much like slabs poured to secure well pipe at the surface once last pipe is sunk. How deep is ground water(Aprox.)in this area of Project Faultless? Could they be monitoring ground water for something?
In Reply to: Re: 6/24&25/06 Trip Report posted by lone wolf on July 04, 2006 at 17:05:33 PST:
Replies: