Re: Tonapah Test Range Construction


Message posted by Frank Stamm on May 10, 2019 at 7:39:22 PST:

I work at Newark Liberty (KEWR) and when a ramp area or runway extension is to be constructed they pile a mound of dirt on the area to compact the subsoil as the airport is built on a swamp . The mound is there for months. This will allow a fully loaded international aircraft to sit without sinking. Maybe this is whats going on here, although not a lot of swamp land in Nevada, my 2 cents.


In Reply to: Re: Tonapah Test Range Construction posted by Tom on May 09, 2019 at 20:23:15 PST:

Replies:



[ Discussion Forum Index ] [ FAQ ]